Email Us

Precision in Steel, Excellence in Delivery: The Wuxi Atlas Project by Megasteel

Table of Content [Hide]

    Recently, the Wuxi Atlas Project was successfully delivered.

    Megasteel has always adhered to its original quality intent, with professional competence and an attitude of excellence, consistently creating quality projects for customers through high quality deliveries and honest contract performance.


    Part 01:Technology Leadership,High Standard Delivery

    The project is located in Wuxi City, Jiangsu Province, and has a total construction area of about 160,000 square meters. It has applied the truss structure system,successfully overcoming the challenges of large-width space construction and accurately meeting the needs of clients. The installation of the primary and secondary structures was completed in one-time. From the details to ensure the overall quality of the project.

    1.png

    In terms of construction management, Megasteel adheres to the concept of "achieving excellence". It conducts repeated discussions, optimizations, and customization for detailed drawing nodes, strictly controls every process, and with an extremely "persistent" spirit, ensures high - quality delivery and perfectly meets the requirements of the clients. 



    Part 02 :Striving for Perfection,Keep it Simple and Extraordinary

    The project is unique in terms of industrial architectural aesthetics. It features a classic gray-and-white color scheme that highlights the simple yet sophisticated ethos of the Atlas project. The external façade lines are smooth and regular, showing the upright strength of the building.

    The project is ingenious in the selection of building materials and construction techniques. It uses flat and seamless sandwich panels with a strict control on surface flatness within 2mm. Facing the challenges of construction techniques, the project team, with exquisite craftsmanship and relentless effort, continuously refined the design and construction, overcoming problems one by one to create a new landmark in industrial architecture aesthetics.


    Part 03: Leading Green Construction,Exploring a Low Carbon Future

    A number of green technology elements were incorporated into the construction process. Tens of thousands of photovoltaic (PV) fixed pillars are precisely arranged and perfectly integrated with the metal roof. While combining aesthetics and practicality, it showcases the unique charms of green technology.

    The construction process follows high environmental standards and uses an integrated design and one-stop delivery model. Megasteel works closely with client's needs to explore the new future of green building together.


    Part 04 :Zero Safety Accidents

    Safety in construction is the bottom line that Megasteel always holds to. Megasteel implemented dynamic management throughout the process. With a complete safety system, the project quality and construction progress will be ensured. The targets of 1.5 million and 2 million safe working hours have been achieved with the combined efforts of all.

    Megasteel continuously optimizes the safety management systems to provide a solid and reliable guarantee for project construction. 


    Megasteel constantly adheres to the original intention and mission of "serving customers efficiently", and repays the trust of customers with high-quality projects one after

    another.

    References